DRAYAGE
Imports are cooling. Is drayage capacity?
Two numbers are sitting in front of a lot of import and logistics teams as 2027 drayage bids come due.
The first is the rate. In its Nov. 2 issue, the Journal of Commerce reported that importers should expect hefty drayage pricing increases during the traditional end-of-year contracting period. Reflecting higher fuel prices and tighter supply, rates were up 20.7% year over year in October, according to the Drayrates–Journal of Commerce National Price Index.
The second is the volume outlook. On Nov. 9, the National Retail Federation and Hackett Associates released their Global Port Tracker update. After an extended peak season, import volume at the nation's major container ports is expected to taper through the rest of the year. The sharper year-over-year decline arrives in early 2027: March is forecast at 1.92 million TEU, down 11.2%.
At first glance, those figures look like they should offset each other. Rates have been high. Inbound volume is expected to cool. For shippers reviewing 2027 coverage, the more useful question is not whether volume will ease. It is whether drayage capacity will.
Lower volume does not automatically mean easier drayage.
Why cooler imports may not loosen capacity
C.H. Robinson's November 2026 drayage update puts the tension plainly: lower U.S. import volume in the months ahead may reduce overall demand for drayage, but that does not necessarily improve capacity in individual markets. Terminal access, equipment availability, and inland transportation conditions still determine how quickly a container can move from vessel discharge to final delivery.
The NRF figures also show why "cooling" should be read carefully. Global Port Tracker projected October at 2.26 million TEU, still up 9.1% year over year. November and December are forecast at 2.05 million and 2.03 million TEU, still slightly ahead of last year. January 2027 is forecast down 3%, and February down 0.5%. The 11.2% decline in March is the first sharp step down, not an immediate reset of the network.
Vessel bunching
Drayage capacity is a daily resource, not a monthly average. When vessels arrive outside their scheduled windows, or several arrive close together, demand for trucks, chassis, and terminal appointments gets concentrated.
C.H. Robinson notes that this can limit drayage moves without any significant change in the number of trucks serving a market. The carrier network can look ample on paper and still be tight on the day your container is ready to leave the terminal.
Dwell time
Containers that remain at the terminal longer than planned have the same effect. The relevant clock is not only how many boxes entered the country this month. It is how long each box occupies a yard slot, a chassis, and an appointment window.
C.H. Robinson's November update makes a useful distinction: the time between vessel arrival, container release, and successful inland delivery is a better measure of operational performance than port throughput or overall truck availability alone. A vessel can finish discharge on schedule and a container can still sit, waiting on equipment, an appointment, or a receiver window.
Chassis
Chassis availability is a function of cycle time, not just the number of frames in a pool. When containers take longer to recover, deliver, or return, the chassis under them cannot be used as often. That reduces effective availability and can increase the number of chassis required to support an otherwise unchanged volume of freight.
Longer queues, equipment repositioning, and warehouse receiving limits can further reduce the number of container moves completed in a day. None of that requires a surge in monthly imports. It only requires the equipment to stay tied up.
Appointments and free time
Terminal appointments are also a scarce daily resource. When arrivals bunch, appointment calendars can tighten at the same time chassis pools do. If a container is not pulled before last free day, demurrage exposure starts to build. After delivery, detention or per diem can accrue if the empty is not returned on time.
Those charges are not a function of whether the national import total is up or down. They are a function of whether someone is watching the container's clock, and whether there is a plan when the appointment, the chassis, or the receiving window slips.
What to ask in 2027 drayage bids
The Journal of Commerce framed this as a contracting-season issue, not only a spot-market one. If you are reviewing 2027 drayage bids, look past the line-haul rate. A lower rate on paper will not protect you if chassis, storage, missed appointments, or free-time overruns show up later as accessorials.
Three questions help separate a rate from a plan:
- How are chassis, pre-pull, and storage handled when appointments are tight? Ask what happens when the container is available but the first workable appointment is after last free day, and who decides whether to pre-pull, store, or wait.
- Who flags a container before free time runs out, and how early? Last free day should be tracked from the moment the container is available, not discovered when a charge appears.
- What does the update look like when plans change? A late vessel, a rolled appointment, a missed window, or a receiver that cannot take the box all require a clear explanation and a recovery plan in the same message, not a status check after the clock has already run.
It is also fair to ask how milestone updates are delivered, who owns the container from the pull through empty return, and how a vetted carrier network is coordinated when volume bunches into a few days. The cheapest rate on paper is not the cheapest move once the clock runs out.
How milestone updates reduce demurrage and detention risk
Most demurrage and detention problems are not mysteries. They happen when availability, last free day, appointment changes, or empty-return deadlines are noticed too late.
Useful container visibility does more than confirm that a shipment exists in a system. It tells you, before you have to ask:
- When the container is discharged and available
- When a carrier is assigned and a terminal appointment is booked
- When a delay or missed window appears, and what the recovery plan is
- When the box is out-gated, delivered, and returned empty, with proof of delivery
Early alerts matter because free time is finite. If a vessel runs late, a terminal appointment shifts, or a warehouse cannot receive the container, the team coordinating the move needs to flag the exposure and present options while there is still time to act: a new appointment, a pre-pull and storage, a transload, or a revised delivery window.
That kind of coordination is also what makes a carrier network useful in an uneven market. Capacity is not only the idea that trucks exist somewhere. It is a carrier, a chassis, and an appointment lining up on the day the container is ready, with one team accountable for the handoffs.
C.H. Robinson's November outlook is measured. More consistent vessel arrivals and moderating import demand could ease short-term strain on terminal appointments, chassis, and drayage capacity, but the improvement may be uneven. Localized constraints can still affect delivery reliability and total transportation cost. Planning for 2027 should assume that volume, timing, equipment, and terminal access all have to work together.
Plan the season, not just the rate
Imports may cool. Drayage may not get easier in the same motion. If you are reviewing coverage for 2027, ask how your partner will watch the clock, not only how they will quote the mile.